The chemical composition is stable up to standard (the company is equipped with pre-furnace testing equipment to test each furnace molten steel to ensure that the product is cast after reaching the standard).
1. Defects such as stomata and sand holes are as low as 0.1%
2. The chemical composition is stable up to standard (the company is equipped with pre-furnace testing equipment to test each furnace molten steel to ensure that the product is cast after reaching the standard)
3. Batch sampling before delivery, spectrometer report, double detection is safer
4. Small margin (2mm-5mm) years of casting experience, master casting cooling steps
FAQ
Q:How long it takes you to provide the designing options for us?
A:One week.
Q:How do you pack the equipment?
A:We load the goods in wooden cases.
Q:Can you can design the equipment according to our size?
A:Yes.
Q:How many years have your company made this kind of equipment?
A:More than 10 years.
Q:How many staff abroad you sent to install the equipment?
A:According to site requirements.
Q:You have sales target finished amount requirement to the distributor?
A:No requirement.
Q:Can I transfer the money to you then you pay to other supplier?
A:Yes.
Q:Can I delivery the goods from other supplier to your factory? Then load together?
A:Yes, sure.